ADU Construction Los Angeles

Build More Living Space Into Your Property

Custom ADU construction planned around your property, your goals and the way the new space will actually be used. From design coordination and permits through construction and final finishes, our team manages the project from the ground up.

36+ Years Experience • Family Owned & Operated • CA General B #1043854
Since 1990 Construction Experience
Planning to Finish One Coordinated Project
Family Operated Personal Project Care
CA #1043854 General B Contractor
ADU construction project in Los Angeles
Custom ADU Construction

More Than an Addition. A Complete Home on Your Property.

An accessory dwelling unit creates independent living space on a property that already has a primary residence. Depending on the property and applicable requirements, that can mean a detached backyard ADU, an attached unit or the conversion of qualifying existing space.

A well planned ADU needs more than a floor plan. Foundation, structure, utilities, energy requirements, windows, roofing, kitchen, bathroom, storage and exterior details all need to work together as one complete residence.

Custom Construction Kitchen Bath & Floors coordinates the project from the early planning stages through construction so homeowners have one team looking at the entire build.

The goal is not simply to fit another structure on the lot. It is to create a home that feels intentional on the property.
Why Homeowners Build ADUs

One Property. More Possibilities.

The right ADU depends on what you want the additional space to accomplish now and how you may want to use it later.

01

Independent Living Space

Create a complete secondary residence with its own living, sleeping, cooking and bathroom areas.

02

Space for Family

Give family members greater independence while keeping them close to the primary home.

03

Long Term Flexibility

Thoughtful layouts can adapt as the way your household uses the additional space changes over time.

04

Custom Design

Plan the layout, kitchen, bathroom, windows, storage and finishes around the intended use of the unit.

05

Rental Possibilities

Depending on applicable requirements and your plans, an ADU may provide an additional long term housing option.

06

A Complete Residence

Kitchens, bathrooms, climate control, utilities and private access give the unit the function of an independent home.

How an ADU Comes Together

The Structure Comes Before the Finishes

Homeowners naturally picture the finished kitchen, bathroom and living area. Before those details can be installed, the building itself has to be created correctly.

ADU framing
Structure

The ADU Takes Shape

Framing establishes walls, openings, ceilings and roof structure and begins defining the finished rooms.

ADU under construction
Building Systems

The Work Inside the Walls

Plumbing, electrical, mechanical work and other systems are coordinated before the walls are closed.

Exterior progress during ADU construction
Exterior Progress

The Building Moves Toward Completion

Roofing, exterior protection, windows, doors and finish preparation bring the structure closer to its completed form.

Complete ADU Construction

What Goes Into Building an ADU

An ADU is a complete residential construction project. Each stage needs to coordinate with the plans, applicable requirements and the work that follows it.

01

Planning & Design

Property conditions, size, layout, access, kitchen, bathroom and exterior design are considered before construction.

02

Plans & Permits

Architectural and required technical plans are coordinated for plan review and permitting.

03

Foundation & Structure

Site work, foundation, framing and structural components establish the physical shell of the residence.

04

Building Systems

Plumbing, electrical and mechanical systems are coordinated with the approved layout and construction.

05

Exterior Envelope

Roofing, windows, doors, weather protection and exterior finishes complete and protect the building.

06

Interior Completion

Drywall, flooring, cabinetry, countertops, bathroom tile, fixtures and finish work complete the interior.

How We Work

One Project From the First Conversation to Completion

01

Understand the Property

We begin with your property, your goals for the ADU and the type of living space you want to create.

02

Plan & Permit

The layout and construction documents are developed around the property and applicable requirements before moving through review and permitting.

03

Build & Complete

Construction progresses through foundation, framing, building systems, inspections and finishes until the new living space is complete.

Framing during an ADU construction project
Behind the Finished ADU

Good Construction Starts Long Before the Cabinets Go In.

Framing is one of the stages where the drawings become a physical building. Wall locations, window and door openings, ceiling conditions and structural components begin defining the finished rooms.

The work also needs to anticipate what comes next. Plumbing, electrical, HVAC, insulation, cabinetry and fixtures all interact with the structure in different ways.

That is why we look at an ADU as one coordinated construction project rather than a collection of unrelated trades.

The parts eventually hidden inside the walls are just as important as the finishes homeowners see every day.
ADU Construction Timeline

What Happens During the Build

A ground up ADU moves through a series of connected construction phases. The week ranges below are included to help homeowners understand the general progression of a project and should be viewed as approximate planning ranges rather than guaranteed dates.

01
Week 1 to 2

Site Preparation & Demo

The work area is prepared for construction. Applicable demolition, debris removal, access and site preparation take place before foundation work begins.

02
Week 2 to 4

Foundation & Underground Plumbing

Excavation, forms, reinforcement, applicable underground plumbing and drainage work are coordinated before the foundation is completed.

03
Week 4 to 6

Framing & Windows

Walls, roof structure, window openings and door openings are framed according to the approved plans and structural requirements.

04
Week 6 to 8

Rough Plumbing, Electrical & Mechanical

Plumbing lines, electrical wiring, outlets, lighting locations, panel work and mechanical systems are coordinated before the walls are closed.

05
Week 8 to 10

Roofing & Exterior Protection

Roofing and applicable exterior weather protection move the structure toward a protected building envelope.

06
Week 10 to 11

Insulation & Drywall

After applicable rough inspections, insulation is installed as required and the interior moves into drywall and wall preparation.

07
Week 11 to 12

Wall Preparation & Paint

Drywall finishing, patching, surface preparation, primer and paint prepare the interior for finish installations.

08
Week 12 to 14

Flooring, Baseboards & Doors

Flooring, interior doors, trim and baseboards begin giving the interior its finished character.

09
Week 14 to 15

Kitchen Cabinets & Countertops

Cabinetry is installed and countertops, hardware, backsplash and related kitchen details are coordinated.

10
Week 15 to 16

Bathroom Tile & Finishes

Bathroom tile, vanity, plumbing fixtures, mirrors and other bathroom finish components move toward completion.

11
Week 16 to 17

Electrical, Plumbing & Mechanical Finishes

Light fixtures, outlets, switches, faucets, toilets and applicable mechanical finish components are installed.

12
Week 17 to 18

Exterior Details & Final Completion

Remaining exterior details, final finish items, cleanup and applicable final inspections bring the project toward completion.

A Note About ADU Construction Timelines

The week ranges above are rough estimates provided only to illustrate how an ADU project may progress. Custom Construction Kitchen Bath & Floors does not guarantee these construction timelines. Every ADU is different in size, layout, design, site conditions, structural requirements, utility work, inspection scheduling, material selections and overall scope. Permit processing and other conditions outside the contractor's control may also affect the schedule. A project specific schedule can be discussed once the actual plans and scope of work are established.

Family Owned & Operated

Your Property Is Treated With the Care It Deserves.

Construction happens on your property. We never lose sight of that.

Custom Construction Kitchen Bath & Floors is a family owned and operated company. Our family has been working in residential construction since 1990, and the reputation attached to our name matters to us.

Whether we are remodeling one room or building an ADU from the ground up, we approach the property with care and respect. That means communicating throughout the project, paying attention to the surrounding home and treating the details as something we are personally responsible for.

An ADU is a substantial project and homeowners should know who is responsible for their home. Our goal is to build a relationship based on communication, accountability and work we are comfortable putting our family name behind.

Personal Attention Every project matters regardless of which stage of construction we are in.
Respect for Your Property We understand that our construction site is also your home and property.
Clear Communication Homeowners should understand what is happening as their project progresses.
Our Name Behind the Work We have built our business through decades of residential construction.
Custom ADU construction in Los Angeles
Planning the Right ADU

How Large Can Your ADU Be?

There is no single size that applies to every ADU project. The type of ADU, property conditions and applicable state and local requirements can affect what may be built.

Rather than assuming that every property can accommodate the same size or configuration, the property and proposed project should be evaluated during planning.

Detached ADU A separate residential structure located on the same parcel as the primary residence.
Attached ADU A secondary dwelling connected to the existing primary home.
Conversion Qualifying existing space may be converted into an independent accessory dwelling unit.
Custom Construction Kitchen Bath & Floors

Experience Across the Entire Build

01

36+ Years of Construction Experience

We have worked on Los Angeles homes since 1990 with experience spanning substantial remodeling and residential construction.

02

Planning Before Construction

Layout, materials and construction requirements are considered early so the finished building works as a whole.

03

Complete Interior Experience

Our remodeling background extends into the kitchen, bathroom, flooring, cabinetry, countertops and finish details that complete an ADU.

04

One Coordinated Project

Structure, building systems and interior finishes are considered as connected parts of one residential project.

ADU Construction FAQ

What to Know Before Building an ADU

Understanding the early decisions can make it easier to plan the right project for your property.

What is an ADU?

An accessory dwelling unit is an independent residential unit located on the same property as a primary residence. It contains living, sleeping, cooking and sanitation facilities.

What types of ADUs can be built?

Common types include detached ADUs, attached ADUs and conversions of qualifying existing space. The right approach depends on the property and your goals.

How large can an ADU be?

ADU size depends on the type of unit, property conditions and applicable state and local standards. The property should be evaluated before assuming a particular maximum size.

Does an ADU need a kitchen and bathroom?

An ADU is an independent dwelling and includes permanent provisions for living, sleeping, eating, cooking and sanitation.

Does an ADU require permits?

Yes. ADU projects require applicable approvals and building permits. Plans are reviewed for the requirements that apply to the proposed project and jurisdiction.

Does an ADU need separate utilities?

Utility requirements depend on the type of ADU, existing services and applicable utility and jurisdictional requirements. Electrical, water, sewer and other utility needs should be considered during planning.

What happens before ADU framing begins?

For new construction, work before framing can include site preparation, excavation, underground utilities, foundation forms, reinforcement, required inspections and concrete work.

What happens after the ADU is framed?

The project typically moves into roofing, windows, exterior protection and rough plumbing, electrical and mechanical systems. Required inspections occur before applicable work is covered, followed by insulation, drywall and finishes.

How long does it take to build an ADU?

There is no guaranteed timeline that applies to every ADU. Project duration depends on design, permitting, utilities, site conditions, inspections, size, layout, complexity and material decisions.

The timeline shown on this page is provided only as a rough example of how construction phases may progress.

Can an ADU be designed to complement the main house?

Yes. Roof form, exterior materials, windows, doors, colors and architectural details can be considered so the new unit relates appropriately to the existing property.

Can you build the kitchen and bathroom too?

Yes. Custom Construction Kitchen Bath & Floors handles complete residential construction, including kitchens, bathrooms, flooring, cabinetry, countertops, tile and other interior finish work.

Where do you build ADUs?

We provide ADU construction and residential remodeling throughout Los Angeles, including communities in the San Fernando Valley and Westside.

Custom Construction Kitchen Bath & Floors is a family owned and operated California General B contractor, license #1043854, with more than 36 years of construction experience.

ADU Construction Los Angeles

Have Space for an ADU? Let's See What It Could Become.

Tell us about your property and how you want to use the additional living space. We can discuss the project, construction involved and the next steps for planning your ADU.