A Beautiful Bathroom Starts With What You Cannot See.
Tile, vanities and fixtures create the finished look. The work underneath them determines how well the bathroom was actually built.
Once demolition begins, we assess the existing plumbing, electrical, framing, subfloor and areas that may have been affected by moisture. Old plywood, damaged framing or water damage needs to be addressed before the bathroom is rebuilt.
We then coordinate the rough work, ventilation, inspections, waterproofing, wall preparation and tile layout before the finished materials are installed.
See What Happens From Start to Finish
Finished photos only show the last stage. Here is the process visually so homeowners can see what happens as an existing bathroom moves through demolition, repairs, preparation and the finished installation.
The Existing Bathroom
Demolition and Existing Conditions
Rough Work and Shower Preparation
The Finished Bathroom
The Finished Bathroom Is Only the Final Stage
A complete remodel moves through demolition, evaluation, rough work, inspections where required, waterproofing, wall preparation, tile and final installation. The work underneath the finishes is part of what creates a properly completed bathroom.
Designed Around the Room and the People Using It
A bathroom can feel completely different when the proportions, materials, lighting and layout work together. We plan the room around how it will actually be used while keeping the finished design clean and intentional.
Everything That Goes Into a Proper Bathroom Remodel
Bathrooms place plumbing, electrical, ventilation, waterproofing and finish materials into a relatively small area. Each part needs to be coordinated with the next.
Layout & Planning
Shower size, vanity placement, storage, lighting and fixture locations are planned around the room and how it will be used.
Demolition & Assessment
Existing finishes are removed so hidden conditions can be evaluated before the new bathroom is built.
Plumbing & Electrical
Rough plumbing, drains, shower valves, lighting and electrical requirements are completed before the walls are closed.
Waterproofing
The shower pan and wet areas are properly prepared before the finished tile assembly is installed.
Tile & Wall Preparation
Shower walls are prepared carefully so tile can be installed over straight, flat and plumb surfaces.
Finishing Details
Vanity, countertops, fixtures, lighting, mirrors, hardware, shower glass and final details complete the room.
What Happens From Demolition to the Final Walkthrough
There are several important stages before tile and fixtures can be installed. Following the work in the proper order allows hidden conditions to be addressed before they are covered by new finishes.
Planning & Material Selection
We establish the layout and review tile, vanity, plumbing fixtures, shower components, lighting, mirrors, hardware and glass.
Demolition & Existing Conditions
Once the old bathroom is opened, we assess framing, plywood, plumbing and other hidden areas. Water damage or deteriorated materials are addressed before moving forward.
Rough Plumbing, Electrical & Ventilation
Plumbing and electrical are completed for the new layout. The exhaust fan and ducting are also evaluated so bathroom moisture is properly vented to the exterior.
Rough Inspections
When inspections are required, the rough plumbing, electrical and other applicable work is inspected before those areas are covered.
Shower Waterproofing
The shower pan and wet areas receive the appropriate waterproofing system. Hot mop waterproofing may be used for the shower pan depending on the shower construction.
Lath, Wall Float & Tile Preparation
The shower walls are prepared with lath where applicable. After the appropriate inspection, we float the walls to create straight, flat and plumb surfaces for tile.
Tile Layout & Installation
Tile size, pattern, grout lines, niches and transitions are considered before installation. Planning the layout helps avoid awkward cuts and improves the finished appearance.
Fixtures & Final Details
The vanity, countertops, plumbing fixtures, lighting, mirrors, hardware and shower glass are installed before the final walkthrough.
Waterproofing and Wall Preparation Matter.
Beautiful tile cannot correct poor preparation underneath it. A shower needs to be built correctly before the first finished tile is installed.
Depending on the shower construction, the pan may receive hot mop waterproofing before moving to the next stage. The walls are then prepared with the appropriate lath and mortar assembly.
We float our shower walls because existing framing is not always perfectly straight. Floating allows the surface to be corrected so the walls are flat and plumb before tile installation. This becomes especially important with large format tile, niches and frameless shower glass.
Materials Need to Look Good Together and Work Together.
Choosing important finishes early helps coordinate dimensions, installation requirements and the overall look of the bathroom. It also gives us time to account for products with longer lead times.
Tile & Stone
Floor tile, shower tile, niches, grout color and transitions are considered together before installation begins.
Vanity & Cabinetry
Vanity size, storage, sink configuration and countertop dimensions are coordinated with the available space.
Fixtures & Shower Components
Faucets, shower valves, handhelds, shower heads and other plumbing fixtures should be selected before certain rough work.
Lighting, Glass & Hardware
Mirrors, sconces, recessed lighting, shower glass and hardware bring the final bathroom design together.
Finished Bathrooms Across Los Angeles
Every bathroom has a different layout, material palette and set of existing conditions. Our work is tailored to the home rather than forcing every project into the same design.
Experience Shows in the Parts You See and the Parts You Do Not.
36+ Years of Remodeling Experience
KBF has been remodeling homes since 1990. Experience helps us recognize issues early and understand how each stage of the bathroom affects the next.
Proper Preparation Before Finishes
Plumbing, waterproofing, walls, subfloor and other underlying work need to be right before the finished materials are installed.
Selections Coordinated With Construction
Important material decisions are made with dimensions, installation requirements and the overall bathroom layout in mind.
One Team Through Completion
We coordinate the stages of the remodel so one company remains responsible for bringing the bathroom together.
We started with a thirty year old leaking shower pan and ended with a magnificent new shower. They showed up every day with skilled staff interested in achieving an excellent result.Read the Full Review on Google
Custom Bathroom Remodeling Throughout Los Angeles
Custom Construction Kitchen Bath & Floors provides complete bathroom remodeling for Los Angeles homeowners who want to update an older bathroom, create a larger shower, improve the layout or completely rebuild the space.
Existing conditions vary from home to home. Older plumbing, uneven framing, previous water damage, deteriorated plywood and outdated ventilation are some of the conditions that may need attention once the bathroom is opened.
Whether you want a clean modern bathroom, a warm natural design or a more luxurious master bathroom, our focus stays on both the finished appearance and the construction supporting it.
Before You Remodel Your Bathroom
Helpful information about bathroom construction, waterproofing, tile, materials, inspections and working with KBF.
What is the full process for remodeling a bathroom?
A complete bathroom remodel begins with planning the layout and selecting the main materials and fixtures. Once demolition begins, the existing plumbing, electrical, framing and subfloor can be evaluated.
Necessary repairs are completed first. Rough plumbing, electrical and ventilation work follow. Required rough inspections take place before those areas are covered.
The shower then moves into waterproofing and wall preparation. Depending on the construction, the shower pan may receive hot mop waterproofing. Lath and the appropriate inspection follow where applicable. We then float the shower walls to create a straight, flat and plumb surface for tile.
Tile, vanity, countertops, plumbing fixtures, electrical finishes, mirrors, shower glass and final details complete the bathroom.
What happens if water damage is found during demolition?
Water damage is not always visible before demolition. Removing the old shower, flooring or wall finishes can reveal deteriorated plywood, damaged framing, plumbing leaks or previous waterproofing problems.
The affected area should be evaluated before the bathroom is rebuilt. Damaged material may need to be removed and replaced, and the source of the moisture should be corrected before new waterproofing and finishes are installed.
What is hot mop waterproofing in a shower?
Hot mop is a traditional shower pan waterproofing method that uses layers of hot asphalt and reinforcing material to create a waterproof membrane beneath the finished shower floor.
Waterproofing is completed before the finished tile assembly. When an inspection is required, the shower pan is inspected at the appropriate stage before construction continues.
Why do you float shower walls before installing tile?
Existing framing is not always perfectly straight or plumb. Installing tile over an uneven surface can make those imperfections visible in the completed shower.
Floating allows the tile surface to be made straighter, flatter and more plumb. This helps tile lines, niches, corners and shower glass come together more cleanly.
Does a bathroom exhaust fan need to vent outside?
Bathroom exhaust ventilation is intended to remove humid air from the room and discharge it to the exterior. Moist shower air should not simply be directed into an enclosed attic or ceiling cavity.
During remodeling, the existing ventilation should be evaluated to make sure bathroom moisture is being directed properly.
When should bathroom tile and fixtures be selected?
Important materials should be selected early enough for their dimensions, installation requirements and lead times to be incorporated into construction.
Shower valves affect rough plumbing. Vanity dimensions can affect plumbing and electrical locations. Tile size influences layout and preparation. Making these decisions early can reduce unnecessary changes during construction.
Can the layout of an existing bathroom be changed?
Yes. Depending on existing conditions, a bathroom can be redesigned by changing the shower, tub, vanity or toilet locations. Walls and door locations can sometimes be changed as well.
Layout changes can affect plumbing, electrical, framing and structural components, so those conditions should be evaluated as part of the planning process.
How long does a bathroom remodel take?
The timeline depends on the size of the bathroom, demolition, layout changes, plumbing and electrical work, inspections, material availability and the complexity of the tile and finish work.
A bathroom that keeps the existing layout can be very different from a master bathroom requiring substantial plumbing changes, custom tile, structural work or specialty materials. We review the anticipated schedule based on the actual project scope.
Do bathroom remodels require permits and inspections?
Permit and inspection requirements depend on the project scope and local jurisdiction. Certain plumbing, electrical, structural and other construction work may require permits.
When inspections are required, they occur at specific stages so the applicable work can be reviewed before it is covered. This may include rough plumbing, electrical work and certain stages of the shower assembly.
What makes a bathroom remodel look high end?
A high end bathroom is not created by expensive materials alone. Proportion, tile layout, lighting, straight walls, clean transitions and the relationship between fixtures and finishes all affect the final appearance.
Simple materials can look beautiful when they are planned and installed carefully. Expensive materials can still look poorly executed when the layout and preparation are not right.
Why choose Custom Construction Kitchen Bath & Floors for bathroom remodeling?
Custom Construction Kitchen Bath & Floors has been remodeling homes since 1990. We handle complete bathroom renovations and coordinate the project from demolition and rough work through waterproofing, tile and final installation.
KBF is family operated and holds California General B license #1043854. Our remodeling projects begin at $8,000.
What areas do you serve for bathroom remodeling?
We provide bathroom remodeling throughout Los Angeles, including Sherman Oaks, Studio City, Brentwood, Bel Air, West Hollywood, Encino, Toluca Lake, Woodland Hills and surrounding communities.
To discuss your bathroom remodel, call Custom Construction Kitchen Bath & Floors at (310) 806-3867 or schedule a consultation through our website.
Ready to Remodel Your Bathroom?
Tell us what you want to change about your bathroom. We can discuss the layout, materials, existing conditions and construction involved in bringing the project together.